top of page
Search

What to Expect During Your Remodel

  • businessera
  • Jul 1, 2014
  • 1 min read

You set a budget, visited showrooms, selected materials and designs, and now your kitchen project is about to kick off. What should be expected during the process?

Countertops Only

  1. Someone will come to your home to template your kitchen. These are the final measurements used in cutting the selected material

  2. After the template is taken, it is imperative that nothing changes nor is moved or adjusted in the kitchen. Even minor shifting of a wall or cabinet or appliance can derail your project.

  3. Once the template is delivered to the shop, an installlatioin date will be provided with an approximate time-frame.

  4. You call a plumber and electrician to disconnect any plumbing.

  5. The countertop is cut and polished with a final inspection before leaving our shop.

  6. The old countertop is removed and the new countertop is installed.

  7. If adjustments are required, on-site grinding or cutting of the countertop may be necessary.

  8. Our crew cleans up and you sign off on the project.

  9. Your plumber and electrician come in to connect the plumbing and wiring (if necessary).

Comments


Featured Posts
Recent Posts
Search By Tags
Follow Us
  • Facebook Classic
  • Twitter Classic
  • Google Classic

© 2014 by Connecticut Solid Surface. All rights reserved

 

Connecticut Solid Surface, 7 Johnson Ave, Plainville, CT 06062 * 860-747-2935

Connecticut Registration 577335

  • Facebook Basic Black
  • Pinterest Basic Black
  • Google+ Basic Black
bottom of page